PPR Tee Pipe Fitting Mould

Packaging & Shipping 1. Mouldbase Standardization Use, whenever possible metric standards like LKM for all the mould components. (including guide bushing, guide pin, ejector pin and so on.) 2. Moudbase surface finishing All plates should be painted with automotive paint blue or green to...
Chat Now

Product Details

Packaging & Shipping


our commitment

All customer-centric,never betray long-term

 benifits for short-term benfits.

our scope of mould business  

Mold,injection molding,product assembly,

surface printing,surface spraying integration

provide information as follow 

2D,3D,samples or pictures of multiple points

 of view with dimensions.

mould production cycles  

15--60days, on basis of the difficulty level

plastic products production cycles

7--15days

mould precision

0.1mm

service life 

 500-1000 thousand times 

cavity number of mold 

Single cavity,Multiple cavity  or one mold 

with different products

mould material

P20,2738,2344,718,S136,8407,NAK80,SKD61,H13

runner system 

Hot runner , Cold  runner

surface treatment 

Words corrosion,Mirror polish,Frosted surface,Dermatoglyph

mould standard

HASCO,DME or according to custom's request

main process 

Milling,grinding,CNC,EDM,wire-electrode cutting, carved,

electrospark,lathe,surface treatment

design software 

CAD, PRO-E, UG etc.

design time 

Within 3 days(generally)

formed material 

ABS,PP,PC ,PA6,PA66, TPU,POM ,PBT,PVC,HIPS,PMMA,

TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE.

quality assurance

ISO9001

factory profile 

5000square meters,100 employees including 8 inspector



1. Mouldbase

Standardization Use, whenever possible metric standards like LKM for all the mould components. (including guide bushing, guide pin, ejector pin  and so on.)


2. Moudbase surface finishing
All plates should be painted with automotive paint blue or green to protect against the corrosion.


3. Cores & cavities
The cores, cavities and inserts made of stainless steel, hardened and tempered up to 45-48 HRC.
Surface finish: Mirror Finish-Diamond Polished.


4. Core wedge blocks

To be manufactured from P20 local steel and heat treatment by gas nitriding.
Wedge blocks need to be located in deep pockets to prevent movement.


5. Steel hardness in general
It is good practice and necessary to have a difference of several points HRC hardness between
sliding steel mould parts to prevent pick up between the steel parts. For example any P20 core slides
or wear plates should be gas nitride










Packaging & Shipping

our commitment

All customer-centric,never betray long-term

 benifits for short-term benfits.

our scope of mould business  

Mold,injection molding,product assembly,

surface printing,surface spraying integration

provide information as follow 

2D,3D,samples or pictures of multiple points

 of view with dimensions.

mould production cycles  

15--60days, on basis of the difficulty level

plastic products production cycles

7--15days

mould precision

0.1mm

service life 

 500-1000 thousand times 

cavity number of mold 

Single cavity,Multiple cavity  or one mold 

with different products

mould material

P20,2738,2344,718,S136,8407,NAK80,SKD61,H13

runner system 

Hot runner , Cold  runner

surface treatment 

Words corrosion,Mirror polish,Frosted surface,Dermatoglyph

mould standard

HASCO,DME or according to custom's request

main process 

Milling,grinding,CNC,EDM,wire-electrode cutting, carved,

electrospark,lathe,surface treatment

design software 

CAD, PRO-E, UG etc.

design time 

Within 3 days(generally)

formed material 

ABS,PP,PC ,PA6,PA66, TPU,POM ,PBT,PVC,HIPS,PMMA,

TPE,PC/ABS,TPV,TPO,TPR,EVA,HDPE.

quality assurance

ISO9001

factory profile 

5000square meters,100 employees including 8 inspector








Our Services

1.Inquiry will be replied within 24hours.

2.Well-trained & experienced staff for  pre-sales,ongoing sales and after-sale service  is always ready to serve you in English.

3.OEM&ODM  cap mould projects are welcome. We have strong R&D team.

4.Your information is confidential to any third party

 

Our Advantage: 

1. Our guarantee time is one year, if any component is damaged during guarantee time, we can send the component to the customer by DHL, TNT freely.
2. Our factory can send our engineer to the customer’s factory install, commission and training freely. The customer provide the double trip tickets, food and accommodation for our engineer. The customer also can send the engineer to our factory to learn the operation and maintains freely.
3. Our factory provide the service for the customer forever, if the customer need operation help, can contact us by MSN, Skype, Email and Telephone at any time, we provide 24 hours on-line service. Our factory also will make DVD to show the operation steps for the customer

4.we will seive you with the top quolity and best price in china


Welcome to contact us:

Contact:Ms vicky

Mobile: +0086 137 3620 6058

Wechat/whatsapp : +0086 137 3620 6058

QQ: 2798299958

Skype:vicky.zhou.123

Email: sales@tzunionmould.com


Inquiry